IT
Business Continuity and Disaster Recovery Planning
Business continuity is the plan for keeping your business running when something goes wrong. Disaster recovery is the technical plan for restoring systems after a failure. Together, they are the difference between a disruption and a catastrophe.
The Jamaica context
Jamaica faces hurricanes, earthquakes, power outages, and connectivity disruptions. Any business continuity plan that does not account for these is incomplete. The plan must address:
- Hurricane season — June to November, with peak in August-September
- Power reliability — outages are common, especially outside Kingston
- Connectivity — fiber cuts and ISP outages happen
- Flooding — can block roads and prevent staff from reaching the office
Step 1: Business impact analysis
Identify your critical business processes and the systems that support them. For each, define:
- RTO (Recovery Time Objective) — how long can the process be down before it causes unacceptable damage?
- RPO (Recovery Point Objective) — how much data can you afford to lose?
These two numbers drive every technical decision that follows.
Step 2: Risk assessment
List the threats that could disrupt each critical process. For each threat, estimate likelihood and impact. Prioritize your investments against the highest-risk combinations.
Step 3: Technical recovery strategy
Design the technical architecture that meets your RTO and RPO:
- Backups — frequency, location, and test recovery
- Redundancy — redundant power, connectivity, and servers
- Failover — automatic or manual, and to where
- Cloud — can critical systems failover to cloud infrastructure?
Step 4: Communication plan
During a disruption, communication is critical. Define: - Who declares an incident? - How are employees notified? - How are customers notified? - Who speaks to the media?
Step 5: Test the plan
An untested plan is a hypothesis. Run a tabletop exercise at least annually — a simulated scenario where the team walks through the plan and identifies gaps. Run a technical failover test at least twice a year.
The cost of not planning
Businesses without a continuity plan that suffer a major disruption typically never recover. The cost of planning is always less than the cost of not planning.
Next steps
If you need a business continuity plan, request a consultation. We assess your risks, define your RTO and RPO, and build a plan that fits your business.

